Is there a method for rescheduling/rerunning a metric check in SQL Monitor?

I have a custom metric I want to be sure is run at 6 am daily but my google fu is failing me and I've been unable to find anything so far...

Answers

  • Eddie DEddie D Posts: 1,611 Rose Gold 4
    Hi, thank you for your forum post.

    Sadly you cannot specify that metric runs at a specific time.  Whilst you can configure it to run daily or hourly or every 1 or 5 or 10 or 30 minutes,  you cannot specify the actual time.

    The first collection will take place within 10 seconds of the metric being created. For metrics with a daily frequency set, subsequent collections will take place at the same time of day as the initial collection.

    Many Thanks
    Eddie 
    Eddie Davis
    Product Support Engineer
    Redgate Software Ltd
    Email: [email protected]
Sign In or Register to comment.