Impact on production
markjm
Posts: 4
I am using Packager to migrate to new hardware.
I have a database with about 20 G of data. Some of the tables have 10M
rows. How long should i allocate to do the packaging?
How much impact will the packaging have on production database?
Will it start massive table scans with table locks?
I have a database with about 20 G of data. Some of the tables have 10M
rows. How long should i allocate to do the packaging?
How much impact will the packaging have on production database?
Will it start massive table scans with table locks?