Could you please give me the process of compiling an aggregated Load Test scenario for different applications for particular time period.

Like at the peak hour, if we load test those applications simultaneously, then is it possible for us to combine those 2 scripts into single one and can we see when the the load start to fail with different load on different applications .
If it is possible please explain the process about that.

Awaiting for the earliest reply.

Thanks
Ramakrishna.P

Comments

  • Options
    Brian DonahueBrian Donahue Posts: 6,590 Bronze 1
    Hi Ramakrishna,

    Thanks for asking. I think that what you want to do is simply create two load test scripts and run them at the same time. You can do this through edit load by adding additional scripts and assigning a ratio describing how many times one script will run as compared to the other script.